Offshore
Supplier for Electrical Engineering
FENIX gas field is part of the Cuenca Marina Austral (CMA-1) license, operated by TOTAL AUSTRAL in Tierra del Fuego, Argentina.
CMA-1 offshore fields have been developed in phases: Hidra Centro & Hidra Norte (1990’s), Carina & Aries (2000’s), VEGA PLEYADE (2015).
FENIX will be developed with a minimum wellhead platform sending its production towards the VEGA PLEYADE platform for subsea connection to existing 24” multiphasic pipeline to onshore Total operated facilities at Rio Cullen via new Wye manifold and spools.
FENIX planned development consists of several phases. FENIX phase 1 development covers three dry tree wells with maximum production capacity of 10 MScmd and MEG supply from onshore. Potential FENIX phase 2 would be the connection of up to four sub-sea wells to the two risers left by phase 1 for this purpose, while potential phase 3 would imply the ultimate connection to a future compression platform when field depletion makes it necessary.
COMPANY: Means Total Austral
CONTRACTOR: Rosetti Marino SpA
SUPPLIER FOR ELECTRICAL ENGINEERING: E-TEC ENGINEERING S.R.L.
BUDGET ORE: 11.000h
Activities
- DESIGN CRITERIA
- ELECTRICAL DIAGRAMS
- REPORTS CALCULATION
- TECHNICAL SPECIFICATIONS
- MATERIAL REQUISITION (MR)
- TECHNICAL BID EVALUATION (TBE)
- MATERIAL TAKE OFF (MTO)
- DRAWINGS
- TYPICAL INSTALLATION DETAILS
- SHORT-CIRCUIT STUDY
- LOAD FLOW STUDY
- PROTECTION COORDINATION STUDY
- MOTOR STARTING ANALYSIS
- VENDORS FOLLOW-UP
- 3D MODELLING